Air, ocean and RoRo freight forwarding from the UK to every continent

Logistics services

Project Cargo & Abnormal Loads

Out-of-gauge, heavy-lift and abnormal loads moved by flat rack, breakbulk or RoRo with survey, permits and lift planning. Project and abnormal load movements are planned from the destination backwards, because the discharge port, road route and available crane capacity decide what is actually achievable long before the item leaves the UK. We survey, plan and permit the whole route before committing to a booking.

Anything that will not fit inside a standard container becomes a project movement: transformers, tanks, silos, boats, crushers, gantries and long steel sections. These shipments are planned backwards from the destination, because the discharge port, the road route and the crane availability decide what is actually possible.

We survey the item, confirm weights and centre of gravity, choose between flat rack, open top, breakbulk vessel space or a RoRo deck on a mafi trailer, then plan lifting points, cradles and lashing with the carrier before anything moves.

Where the UK leg needs abnormal load notification, escorts or route surveys, we arrange them with the haulier and the relevant authorities so the collection date holds.

What our project cargo and abnormal load service covers

Planning and execution for out-of-gauge and heavy-lift shipments, worked backwards from the destination port, road route and crane availability.

Pre-shipment survey

Weights, dimensions and centre of gravity confirmed before any equipment is booked.

Lift and lashing planning

Cradles, seafastening and lifting points engineered and, where needed, signed off with the carrier.

UK abnormal load transport

Route surveys, notifications and escorts arranged for the haulage leg to the loading port.

Destination discharge coordination

Crane availability and inland transport at destination confirmed as part of the plan, not left to be arranged on arrival.

What counts as project cargo

Project cargo is anything that will not fit inside a standard shipping container: transformers, pressure vessels, tanks, silos, boats, industrial crushers, structural steel sections and complete production lines. These shipments are typically one-off or low-frequency, high-value, and require individual planning rather than a standard rate card.

The defining feature is that the item's size, weight or shape dictates the equipment and route used, rather than the item being adapted to fit standard freight equipment. That makes early engagement essential, since a shipment planned only after a sale is agreed can run into avoidable constraints on vessel space, port cranes or road clearance.

Shipping methods for out-of-gauge cargo

Flat rack containers suit items too wide, tall or heavy for a standard box but still manageable in length, with the load lashed to a container base frame rather than enclosed. Open-top containers work for tall items that can be lowered in from above by crane. Breakbulk vessels, which load cargo individually rather than in containers, suit the largest and most awkwardly shaped items, while a RoRo deck on a mafi trailer offers an alternative for wheeled or trailer-mounted loads that can be driven or towed aboard.

Choosing between these options depends on the item's exact dimensions, weight distribution and whether the destination port has the crane capacity to handle it, which is why a proper survey comes before any equipment is booked rather than after.

  • Flat rack containers for wide, tall or heavy items
  • Open-top containers for tall items loaded from above
  • Breakbulk vessel space for the largest or most awkward shapes
  • RoRo mafi trailers for wheeled or trailer-mounted loads

Survey, weight and lift planning

We survey the item in person or from detailed drawings to confirm actual weights, dimensions and centre of gravity, since these figures determine which equipment can be booked and what lashing or cradling is needed. Getting the centre of gravity wrong can affect both the stability of the load during the sea passage and the safe working load of any crane used to lift it.

Lift planning covers the lifting points on the item itself, the cradle or seafastening structure built to support it, and coordination with the carrier's own engineers where the item is large enough to need sign-off before loading. This planning happens well before the collection date, not as a last-minute step at the quayside.

Flat rack, open top, breakbulk, mafi trailer

Equipment options

Centre of gravity

Key planning input

Several weeks to two months

Typical booking lead time

Abnormal load notification

UK transport requirement

UK abnormal load transport

Where the item exceeds standard road transport dimensions or weight limits for the UK leg to the port, we arrange abnormal load notifications with the relevant highway authorities, and where required, a route survey to check bridge heights, weight limits and turning circles along the intended path. Police or pilot escorts are arranged for loads that require them under the notification.

Route surveys sometimes reveal that the shortest route is not actually usable because of a low bridge or weight-restricted road, in which case an alternative route is planned and the notification updated accordingly, all before the collection date is confirmed.

Customs and export documentation

Project cargo needs the same export customs declaration as any other shipment, but often with more detailed technical descriptions and valuations given the specialist nature of the goods, and sometimes an export licence where the item or its destination is subject to trade controls. We prepare this documentation alongside the lift and route plan rather than treating it as a separate, later step.

Certificates covering seafastening, lashing and, where relevant, structural certification for the lifting arrangement are also compiled, since these are frequently requested by the carrier, the insurer or the receiving port before the item is accepted for loading or discharge.

Pricing structure for project cargo

Pricing is built up from freight, UK abnormal load haulage, survey and engineering costs, port handling and crane charges, and any escort or route survey fees, since these individually can be significant on an oversized shipment and are often what separates an accurate quote from an optimistic one. We include all of these from the outset.

Because every project shipment is different, we do not offer a standard rate card for this service; instead, we build a specific costed plan once the survey and route work is complete, so the final invoice matches what was quoted rather than accumulating surprise charges along the way.

How a project cargo movement is plannedStart a booking
  1. 1

    Survey and data collection

    We confirm weights, dimensions and centre of gravity for the item.

  2. 2

    Method selection

    Flat rack, open top, breakbulk or mafi trailer is chosen based on the survey.

  3. 3

    Route and haulage planning

    UK abnormal load routes are surveyed and notifications arranged.

  4. 4

    Lift and lashing engineering

    Cradles and seafastening are engineered and agreed with the carrier.

  5. 5

    Loading and destination discharge

    The item is loaded, shipped and discharged with inland transport coordinated on arrival.

Transit times, insurance and destination handling

Transit times depend heavily on vessel availability, since breakbulk and heavy-lift vessels sail less frequently than standard container or RoRo services, and lead times of several weeks to a couple of months between booking and sailing are common. This makes early planning particularly important where a project has a fixed installation date at the far end.

Given the values and complexity involved, marine insurance is strongly recommended and is usually arranged to cover the full chain from lifting at origin through the sea passage to discharge and inland transport at destination, where our agent coordinates the final delivery and any site access requirements with the receiving party.

Project Cargo & Abnormal LoadsCommon questions

How is project cargo different from a normal container shipment?
It is planned around the item's own dimensions, weight and shape rather than fitted into standard equipment, and usually requires a specific vessel booking and lift plan rather than a standard rate.
Do I need a route survey for UK transport?
If the item exceeds standard road limits, a route survey checks bridge heights, weight limits and turning circles before the collection date is confirmed.
How far in advance should I book a project shipment?
We recommend engaging as early as possible, since breakbulk and heavy-lift vessel space is booked less frequently than standard sailings and survey work takes time.
Is insurance essential for project cargo?
It is strongly recommended given the values and complexity typically involved, and can be arranged to cover the full chain from lifting at origin to final delivery.

Service checklist

  • Flat rack, open top, breakbulk and mafi trailer options priced side by side
  • Pre-shipment survey, weights, centre of gravity and lift planning
  • Abnormal load notifications, escorts and UK route surveys
  • Cradles, bespoke crating, seafastening and lashing certificates
  • Destination discharge, inland transport and site delivery co-ordinated

Related logistics services